Project

Sweden - Nuclear Power Plant Ringhals

Projects Dismantling of a pressurizer in the Swedish nuclear power plant Ringhals for Vattenfall in cooperation with EBS. Contamination inside the pressurizer task and problem definition Avoiding risk of contamination …

Projects

Dismantling of a pressurizer in the Swedish nuclear power plant Ringhals for Vattenfall in cooperation with EBS.

Contamination inside the pressurizer

task and problem definition

  • Avoiding risk of contamination
 
  • Cold cutting process
 
  • Mechanical cutting process
 
  • Wall thickness 120 mm

First cut - 100 mm

20 mm wall thickness remains. As the pressurizer remains tight, there is no risk of contamination. As it is not yet completely cut through, the work can be carried out under normal conditions.  

Second cut - 20 mm

During the second cut, the machine is controlled via cameras. Due to our cutting concept and the negative pressure within the pressurizer, there was no contamination outside the pressurizer.  

Watch video

Here for you personally

Do you have any questions?